BR, Class 370 Advanced Passenger Train, Sets 370 003 and 370 004, 5-car pack - Era 7



Pre-Order
New Tool
c Available to Pre-order now Don't miss out! Pre-order today and be amongst the first to receive this item.
Pre-order FAQ'sPre-order FAQ's
- What is a pre-order? It is possible to secure some items before they come into stock by pre-ordering on the website. This is especially useful when a product is anticipated to be popular, and could sell out in a short time once released.
- When will my pre-order arrive? The product listing gives an estimated arrival time for the product, please note that this date can change due to changes in manufacturing and shipping schedules. These dates are updated monthly, keep track of your pre-orders by logging into My Orders for the latest estimated arrival date. When stock arrives, pre-orders are despatched in the order that they were placed.
-
What happens if the price of my item changes while on pre-order? If the price of your pre-order item changes after you have placed your order, we will only ever charge you the lowest price between time of ordering and when the item comes into stock and is despatched to you. For example, if you pre-order an item and the price is subsequently increased, you will still be charged the original price. However, if you pre-order an item and the price is subsequently decreased, you will be charged the lower price.
- When will I be charged? Your card will only be charged when the items are in-stock and ready to be despatched.
- Are my card details safe? Yes – we use an external, secure payment system, Braintree (part of PayPal) to store and handle your card details.
- Can I cancel my pre-order? Yes – you can cancel a pre-order before it has been despatched. Log into My Orders, or contact our Customer Care team with your pre-order number on 01843 233512 or customercare@hornby.com
- Can I pay by PayPal for a pre-order? Yes you can.
- How many items can I pre-order? There is no limit to the number of pre-orders that you can place. However, for some products there may be a limit on the number of units that can be pre-ordered. This will be clearly marked on the product listing.
- How do delivery charges apply to pre-orders? Pre-order items will be despatched as soon as they come into stock and will therefore incur delivery charges where applicable. If you have different pre-order items in your basket, or a mixture of pre-order and in stock items these will each show a separate delivery charge.
- What happens if my registered card expires before my item comes into stock? If your card expires, we will send you an email asking you to log into your account and update your card details.
- What if I decide to pay with a different card after I place my pre-order? You can change the registered card for each pre-order by visiting My Orders.
- Will you definitely have the stock to fulfil my pre-order? Yes – unlike some websites, which take pre-orders without securing stock in advance, we guarantee that we have secured stock levels for our pre-orders. In the unlikely event that we cannot honour your pre-order (except when a product is completely withdrawn before release) we will give you a £10 gift voucher to spend on the website.
- Can I make a pre-order by post or telephone? Yes you can, but payment must be with a credit/debit card. Please call our Customer Care team on 01843 233512 or customercare@hornby.com
- Can I use a Club or discount code on pre-orders? Yes you can.
Product Information
FREE UK Delivery when you spend over £30.
Please allow up to 3 working days for UK delivery following the day you placed your order.
* Club membership packages do not count towards free delivery thresholds
Europe - 3-5 days
Rest of World - 5-10 days
We also offer FREE delivery to selected international destinations
Description
British Rail Class 370 Advanced Passenger Train 5-car Pack Set 370 003 comprising DTS Sc48103, TBF Sc48603 and NDM Sc49003 City of Derby, along with Set 370 004 comprising TBF Sc48604 and DTS Sc48104. By the end of 1970 the British Rail Board began considering the third design phase of the Advanced Passenger Train; the prototype for the full production trains that would incorporate the technology of the APT-E in a practical application.
From the outset the pre-production APT project, or APT-P, was considered to be nothing more than a proving prototype for evaluation, prior to the finalised Advance Passenger Train design being authorised for squadron service; the APT-S. Having settled on electric traction for the production APT, the West Coast main line between Euston and Glasgow was the obvious route for conducting testing, being electrified along its length and with some severe curves that curtailed high speed travel.
The date for commencement of services was set for 1977 and the Chief Mechanical and Electrical Engineers' Department (CM&EE) design engineers began work in October 1973. In a move similar to the current situation of the DfT defining design specifications, it was the passenger business of British Rail that decided upon the original configuration for the APT-P; each set was to comprise fourteen cars, with the two power cars marshalled at the outer ends of the sets.
It soon became clear that the use of two pantographs, one on each power car, was unsuitable for the OHP wires in place at that time and the use of two power cars in the middle of the train became the only option, effectively cutting the train in half. This created two 1+6 formations of DTS, TS, TRBS, TU, TF, TBF and NDM (Non-Driving Motor), through which passengers could not pass due to the high magnetic fields generated by the electrical equipment contained in the NDM.
The NDM was the first vehicle completed for testing in June 1977 and it spent a year on static tests at RTC Derby, as well as dynamic tests on the WCML with a spare HST Power Car from September 1977. In mid-1978 the power car was joined by the rest of the first half set for testing on the WCML and was unveiled to the press on June 7th but, hampered by industrial action, it was to be February 1979 before various formations of the full train were marshalled to test different aspects of the train.
At the end of the year, on December 20, 1979, a new rail speed record of 162.2mph was achieved and by March 1980 all three APT-P trains were delivered and ready for mileage accumulation on the WCML. Having finally achieved full route clearance and with testing indicating that all was progressing to plan, shadow passenger service was set to commence on June 9, 1980 with a daily Glasgow/London return service.
A demonstration run on April 18th with a 1+9 set was meant to usher in a new era of high speed rail travel, but a derailment caused by a faulty articulated bogie signalled the beginning of the APT 'jinx' and the postponement of passenger introduction. Wheelsets had to be rebuilt across the fleet, and reliability problems with the tilt, transmission and braking systems were also exacerbated by the mediocre ride quality.
It was also found that failure of the tilting mechanism could result in the APT exceeding its kinematic envelope and potentially coming into contact with an APT travelling in the opposite direction. It was to be Spring 1981 before main line testing could resume and by now media and public opinion was turning against the project, with some individuals in Government and within the British Railways Board expressing their discontent as well.
Entering public service on December 7, 1981 at first all went well, but very cold weather in Scotland on December 9th and again on December 11th resulted in the brakes freezing and the APT being taken out of traffic until the summer of 1982. A year of technical R&D project running followed, before limited passenger running took place across 1983/84 to assess passenger comfort using the full 2+12 sets between London Euston and Glasgow, culminating in a new time and speed record for the 401 mile trip of three hours and fifty-two minutes; an average speed of 103mph.
Far exceeding its budget, APT-P had now effectively reached the end of its development programme and although a number of plans had been suggested for the implementation of APT in service, in a number of formations and with varying traction options, the APT-S, APT-R, APT-T, APT-U and APT-V projects never materialised. The fleet of six sets had been reduced since March 1983, parts being cannibalised to keep the remaining vehicles running and at the end of May 1985 the APT-P was withdrawn from service, with the Intercity Development Train (APT-D) continuing until December 1986.
Create an Early Fourteen Car Formation
To complete your fourteen car formation, add the following SKUs (sold separately): -

Hornby
Hornby is a household name and is famous as the UK's brand leader in the model railway hobby with its high quality 00 gauge (1:76) models and accessories.
Safety Notice
Detailed scale model. Not suitable for children under 14 years. Please refer to safety notes in enclosed instruction leaflet. Colours and contents may differ from those illustrated. Please retain these details and the address for future reference.
Technical Specification & Detail
Scale | 1:76 |
Gauge | 00 |
Finish | Satin |
Length | 27.6 |
DCC Type | DCC Ready |
Period | Era 8 (1982 - 1997) |
Operator/Livery | BR Intercity, Intercity Executive |
Limited Edition Size | 1050 |
Class | Class 370 |
Designer | BREL |
Minimum Curve | R2 |
Age Suitability | 14+ |
Motor | 5 Pole Skew Wound |
Wheel Configuration | EMU |
Customer Images
Want to contribute images of your purchase to the community? Upload it here and we will showcase the best.
No one has submitted an image yet for this product, why not submit one above?